Scale Up Your Business In One of Our Data Center Locations:
Built for Hyperscalers Who Can’t Afford to Wait
If you’re a hyperscaler, here’s what you already know:
Speed matters. Reliability matters. Efficiency matters. And in this environment, average isn’t good enough.
At MSB Global, we don’t follow the industry. We outperform it.
Where legacy developers deliver cookie-cutter sites on slow timelines, we bring turnkey campuses powered by clean energy, engineered for AI-ready workloads, and designed to go live faster than anyone else in the space.

We’re Building While They’re Still Googling Sites
We don’t chase dirt—we lock down power-loaded, latency-perfect, permit-ready sites before you even hit “RFP.”


Site Selection Isn’t Just About Land.
We don’t just hunt for acreage—we secure power-dense, future-ready sites before you even need them. That means:
• Access to scalable utility power (we’ve secured over 4GW worth of clean energy PPAs)
• Low-latency connectivity near major metros and subsea cables
• Fast-track zoning, permitting, and entitlements in place—ready for EPC today
Most developers start when you call.
We’re already building.

Tier IV reliability. 2N+ redundancy. Immersion cooling standard.
While others offer outdated builds, we deliver:
• 600 kW+ rack density with immersion cooling pre-integrated
• Zero HVAC water usage for WUE = 0
• Tilt-up concrete builds engineered for speed and resilience
• N+2 mechanical, seismic- and hurricane-resistant, and ready for global compliance
Every MSB site is designed for AI-scale power loads, high-density clusters, and energy optimization out of the gate—not tacked on later.

Hyperscale speed doesn’t mean rushed—it means ready.
We manage all 25+ development milestones under one roof, including:
• Topo surveys, staking, geotech
• Substation & switchyard development
• Utility and dark fiber negotiations
• Full EPC delivery with commissioning and staffing
Most developers take 18–24 months.
We’re delivering in 9–12.
We Don’t Just Meet Expectations —
We Raise Them
Compare us to anyone:
Category | MSB Global Services | Most Developers |
Cooling | Immersion (100kW+ density) | Raised floor or air-cooled (30–50kW) |
Water Usage | WUE = 0 | High water consumption |
Power Redundancy | 2N + N+2 | Often N+1 or lower |
Build Timeline | 9–12 months | 18–24 months |
Design Flexibility | Modular + AI/HPC ready | Standardized legacy designs |
Clean Energy Integration | 4 GW+ PPAs secured | Dependent on utility coordination |
We’re Not a Vendor. We’re a Partner.
You get a single point of contact from land to lights-on. We bring investor-backed certainty with Invema Capital and tier-one supply chain partners. Our team has delivered over 4GW of energy and infrastructure projects nationwide. We don’t make you fit our model—we build a better model around you.
Why Hyperscalers Are Turning to MSB
Because we deliver what they can’t get elsewhere:
- Speed-to-market that crushes industry benchmarks
- Custom design for ultra-high-performance AI workloads
- Sustainable, zero-water facilities that future-proof operations
- Fully turnkey development—including operations transition
Let’s Build the Data Center You Actually Need.
Tired of delays, bottlenecks, and compromises?
Work with the team that’s already solving tomorrow’s challenges today.
Hello world!

Achieving Sustainability in Data Centers: MSB Global’s Green Blueprint
